Development

For its development, TERPORT is making significant investments :

Short term actions:
  • Concreting (being finished) of zone B
  • Concreting of zone C planned for the end of 2020
  • Realization of a reefer park with a capacity of 100 catches
  • Rehabilitation of the fire park.


 

Medium-term actions :
  • Studies and construction of an operating building of three (03) levels over a surface area of 500m2
  • Construction of a 1000m2 cold store
  • Creation of a general merchandise store of 1000m2
  • Realization of a maintenance workshop with its living area
  • Acquisition of two additional (02) ReachStackers of 45 T
  • Acquisition of two additional (02) electric forklifts
  • Acquisition of a diesel forklift


Long-term listed stocks :

  • Acquisition of a pneumatic stacking gantry to increase container reception and processing capacities.
  • Establishment of a connection to the national rail network which passes near TERPORT (500 meters) in order to carry out container transfer operations by rail.